VIRTUAL TOUR -- City parking lot site -- between Santa Cruz and Menlo Avenues at Crane St. -- PERMEABLE CONCRETE

Unlike Phase 1, Phase 2 includes a row of pervious concrete stalls along the sidewalk. These stalls are not next to a biofilter. Any runoff that is not absorbed by the pervious concrete would flow out these outlet pipes to Crane Street. A similar set of three outlet pipes drains the side that slopes toward Evelyn Street (which does not contain any pervious concrete stalls). 5/15/06
Previous Home Next

17-gutter-outlet